Cheif Filed engineer (EPC Company)Hal yang baikPosition at site : Chief Field Engineer
a. Do technical clarification for drawing and technical specification at site project
b. Ensure that product and service suitable with contract project and government regulation
c. Ensure that clients are satisfied with the products and services of the team on its part
d. Acts as a liaison between the project site and home office Jakarta specifically related to field engineering activities (Civil, Mechanical, Piping, Instrument, Electrical and Process)
e. Problem solver for engineering activities at site such as misfabrication, misdimension and etc that related to field engineering activities
f. Check shop drawing and do directions to the subcontractor for clarify and resolve nonconformities design drawing
g. Do monitoring as built drawing
h. Prepare presentation to present field sketch to owner and local government
i. Do review and provide approval for material from local vendor while maintaining the quality of goods
j. Attend the meeting with owner, subcontractor specifically related to field engineering and prepare minute of meeting
k. Prepare requisition for work package and carry out technical evaluations for material procure at the project site
l. Do controler all documents, especially construction drawings, drawings from vendors, and specifications including document storage and distribution to related parties
m. With assist construction superintendent together approve method statement from subcontractor
TantanganPosition at site : Chief Field Engineer
a. Do technical clarification for drawing and technical specification at site project
b. Ensure that product and service suitable with contract project and government regulation
c. Ensure that clients are satisfied with the products and services of the team on its part
d. Acts as a liaison between the project site and home office Jakarta specifically related to field engineering activities (Civil, Mechanical, Piping, Instrument, Electrical and Process)
e. Problem solver for engineering activities at site such as misfabrication, misdimension and etc that related to field engineering activities
f. Check shop drawing and do directions to the subcontractor for clarify and resolve nonconformities design drawing
g. Do monitoring as built drawing
h. Prepare presentation to present field sketch to owner and local government
i. Do review and provide approval for material from local vendor while maintaining the quality of goods
j. Attend the meeting with owner, subcontractor specifically related to field engineering and prepare minute of meeting
k. Prepare requisition for work package and carry out technical evaluations for material procure at the project site
l. Do controler all documents, especially construction drawings, drawings from vendors, and specifications including document storage and distribution to related parties
m. With assist construction superintendent together approve method statement from subcontractor