manajemen proyek konstruksi di Semua klasifikasi
Ubah pencarian saya
Listed more than six days ago

Jadilah pelamar pertama

Ini adalah lowongan kerja Full time

Lamasi, Sulawesi Selatan
Reporting to the Superintendent – Open pit, the Senior Engineer – Mine Production is responsible for pit development, open-pit mine design, with a...
Reporting to the Superintendent – Open pit, the Senior Engineer – Mine Production is responsible for pit development, open-pit mine design, with a...
subClassification: Pertambangan – OperasionalPertambangan – Operasional
classification: Pertambangan, Sumber Daya Alam & Energi(Pertambangan, Sumber Daya Alam & Energi)
6 jam yang lalu
6 jam yang lalu
Listed more than two days ago

Akan segera berakhir

Ini adalah lowongan kerja Full time

Lamasi, Sulawesi Selatan
Reporting to the Superintendent - IT, the Senior Engineer – Information Technology (IT) will assist in project management and the delivery of...
Reporting to the Superintendent - IT, the Senior Engineer – Information Technology (IT) will assist in project management and the delivery of...
subClassification: Administrasi Jaringan & SistemAdministrasi Jaringan & Sistem
classification: Teknologi Informasi & Komunikasi(Teknologi Informasi & Komunikasi)
2 hari yang lalu
2 hari yang lalu
Listed more than fifteen days ago

Ini adalah lowongan kerja Kontrak

Sulawesi Selatan
We’re looking for a Cost Controller (Contract Based) to join our Indonesia team. When you work for us, you get the chance to join nearly 50,000...
We’re looking for a Cost Controller (Contract Based) to join our Indonesia team. When you work for us, you get the chance to join nearly 50,000...
subClassification: Teknik Sipil/StrukturalTeknik Sipil/Struktural
classification: Teknik(Teknik)
15 hari yang lalu
15 hari yang lalu
Listed more than nineteen days ago

Ini adalah lowongan kerja Kontrak

Sulawesi Selatan
We’re looking for a QA/QC Inspector (Contract Based) to join our Indonesia team. When you work for us, you get the chance to join nearly 50,000...
We’re looking for a QA/QC Inspector (Contract Based) to join our Indonesia team. When you work for us, you get the chance to join nearly 50,000...
subClassification: Penjaminan & Kontrol MutuPenjaminan & Kontrol Mutu
classification: Manufaktur, Transportasi & Logistik(Manufaktur, Transportasi & Logistik)
19 hari yang lalu
19 hari yang lalu
Ubah pencarian saya
Seberapa relevan hasil pencarian Anda?

Dapatkan lowongan baru untuk pencarian ini melalui email

Kembali ke hasil pencarian
Ubah pencarian saya

Pilih lowongan kerja

Tampilkan detail di sini